Engineering Solution
The operation is studied as an integrated system: building geometry, environmental conditions, operator movement, equipment, rescue strategy and lifecycle use.
Standard market equipment could not satisfy the intervention geometry and lifting constraints.
Standard market equipment could not satisfy the intervention geometry and lifting constraints.
Restricted movement, facade interfaces and certification requirements.
Custom Equipment, FEA, Prototype Testing
A bespoke device developed through CAD, FEA, prototyping and testing.
The operation is studied as an integrated system: building geometry, environmental conditions, operator movement, equipment, rescue strategy and lifecycle use.
Maintainability had to be integrated without compromising architectural intent.
View case study →
A highly glazed tower required a safer and more efficient inspection and maintenance strategy.
View case study →Every project begins with its geometry, environment, operating conditions and lifecycle priorities.